SEAFDEC/TDINSTITUTIONAL REPOSITORY
    • English
    • ไทย
    • 日本語
  • 日本語 
    • English
    • ไทย
    • 日本語
  • ログイン
アイテム表示 
  •   ホーム
  • 01 SEAFDEC/TD Publications
  • 04 Technical Publications and Reports on Fishery Resources
  • Resources and Environmental Survey
  • アイテム表示
  •   ホーム
  • 01 SEAFDEC/TD Publications
  • 04 Technical Publications and Reports on Fishery Resources
  • Resources and Environmental Survey
  • アイテム表示
JavaScript is disabled for your browser. Some features of this site may not work without it.

Bi-annual Project Progress Report of Integrated Coastal Resources management in Pathew District

Thumbnail
閲覧/開く
TD-RP-98.pdf (5.647Mb)
Downloads: 88
日付
2006-07
著者
Etoh, Sei
Page views
239
Share 
 
Metadata
アイテムの詳細レコードを表示する
抄録
As a whole, the project has progressed on the right track compatible with the project design, and the process for project phasing out has being advanced as expected. The activities have been carried out are listed as follow:

- The registration of the Pakklong Fishermen’s Group (PFG) with the Chumphon Provincial Cooperative Promotion Office (PCPO) was under the name of PhakklongAquaculturists’ Group (PAG). The new committee mambers of PAG were elected at the 1st PAG meeting. So far, 67 members of PFG have joined the PAG.

- The study tour to Japan was jointly organized by the NPO group in Japan and SEAFDEC/TD to observe mainly the CBFRM approach to various activities undertaken by the Japanese fishermen’s cooperatives.

- Regular monitoring surveys have been conducted as planned.

- Three experiments conducted were babylonia shell culture, swimming crab culture and comparative fish culture with different types of feeding.

- The women’s group activity is progressing well.

- The training in local enforcement activities was held in Pakkong, but the planned establishment of the Local Enforcement Unit (LEU) is still far from reality.

- The 10 sets of FEDs were installed to test its durability.

- A total of 1.5 million tiger-prawn postlarvae were released

- The 3rd SC meeting was held.

- The 9th IC meeting was held.

- The study tour team from the sister project in Cambodia visited the project site to observe the activity and exchange views with the PFG members.

- The project staff and leading PFG members participated in various seminars and workshops organized both in the country and abroad.
URI
http://hdl.handle.net/20.500.12067/354
Collections
  • Resources and Environmental Survey [59]

© SEAFDEC/TD 2025
連絡先 | ご意見をお寄せ下さい
 

 

ブラウズ

リポジトリ全体コミュニティ/コレクション公開日著者タイトル主題このコレクション公開日著者タイトル主題

登録利用者

ログイン登録

統計

View Usage Statistics

© SEAFDEC/TD 2025
連絡先 | ご意見をお寄せ下さい